From version 1.1

edited by Bart Vastenhouw
on 2022/02/09 13:14
on 2022/02/09 13:14
Change comment:
There is no comment for this version
Summary
Details
- Page properties
-
- Author
-
... ... @@ -1,1 +1,1 @@ 1 - xwiki:XWiki.BartVastenhouw1 +XWiki.xinwan - Content
-
... ... @@ -1,0 +1,32 @@ 1 +**Week 1:** 2 +* Find and form the project group, discuss with Cesar about the problem we want to address for the PwD using Robot 3 +* Get familiar with Wiki Page 4 + 5 +**Week 2:** 6 +* Group discussion on problem statement and robot 7 +* Worked on the Robot Partner page based on the summary of lecture 8 +* Collaborated on use cases, scenarios and problem statements 9 + 10 +**Week 3** 11 +* Worked on the Design Patterns and Ontology page based on the summary of lecture 12 +* Collaborated on thinking of personas 13 + 14 +**Week 4** 15 +* Collaborated on functionalities, claims, evaluation and prepare the presentation 16 +* Collaborated on designing the IDP and TDP 17 +* Worked on the Measuring Instruments page based on the summary of lecture 18 +* Got familiar with Interactive Robots platform and Choregraphe 19 + 20 +**Week 5** 21 +* Finished the presentation and improved our ideas (use cases, functionalities, claims and evaluation and design pattern) based on the feedback given from the presentation 22 +* Studied on how to programming the Pepper with Choregraphe with the help of online tutorials 23 +* Collaborated on designing the flow dialog for our use cases 24 + 25 +**Week 6** 26 +* Considered the possibility of addressing inclusivity in the project report 27 +* Group Worked on programming with 2 different types of Pepper(intelligent and non-intelligent) in the lab 28 + 29 +**Week 7** 30 +* Collaborated on making the questionnaire and finalize the prototype 31 +* Collaborated on evaluating our two version of prototypes with participants and analysed our evaluation results. 32 +* Finalize the XWiki based on the received comments from lecturers.