95 95  
96 96  **Report**
97 97  - Wrote the a first version of the inclusive design page.
98 -- Implemented the feedback from the presentation:
99 - - Reworked on the Team Design Patterns
100 - -
98 +- Implemented the feedback from the presentation about the team design patterns
101 101  
102 102  ==== Week 7====
103 103  
... ... @@ -134,7 +134,9 @@
134 134  - Humanoid Robot: As some feedback given on this page by group members has not been implemented in more than 2 weeks, I took the liberty to completely rework this section.
135 135  - Implemented the feedback of the professors about the Ontology based on some literature.
136 136  - Adjusted the Introduction.
137 -- Added citations to the pages that needed sourcing.
135 +- Added citations to the pages that needed sourcing (Including research).
136 +- Made some analysis about the data we collected for our results.
137 +- Explored different visuals for displaying the results
138 138  - Proof-read the entire report iteratively as we improved sections repeatedly.
139 139  - Gave some constructive feedback about 90% of the sections on the Xwiki or by group messages.
140 140  - Analysed other group's work report and made minor edits to few sections about aesthetics and structure.
... ... @@ -142,4 +142,7 @@
142 142  - Improved and adapted the general aesthetic of the pages to the export features of XWiki (because export feature changes the nature of the webpages).
143 143  
144 144  == Personal Reflections==
145 +In general I really enjoyed working on this project. I found the lectures to be really interesting. The guest lecturers were really interesting and
146 +The iterative process nature of this class makes it very
145 145  
148 +A significative downside of this project was the lack of motivation of a few team members. It really felt like two groups of people emerged weeks after weekshe fact.that the entire grade is