Changes for page Pierre Bongrand

Last modified by Pierre Bongrand on 2022/04/05 19:37

From version Icon 25.10 Icon
edited by Pierre Bongrand
on 2022/04/05 01:52
Change comment: There is no comment for this version
To version Icon 25.9 Icon
edited by Pierre Bongrand
on 2022/04/05 01:44
Change comment: There is no comment for this version

Summary

Details

Icon Page properties
Content
... ... @@ -95,7 +95,9 @@
95 95  
96 96  **Report**
97 97  - Wrote the a first version of the inclusive design page.
98 -- Implemented the feedback from the presentation about the team design patterns
98 +- Implemented the feedback from the presentation:
99 + - Reworked on the Team Design Patterns
100 + -
99 99  
100 100  ==== Week 7====
101 101  
... ... @@ -132,9 +132,7 @@
132 132  - Humanoid Robot: As some feedback given on this page by group members has not been implemented in more than 2 weeks, I took the liberty to completely rework this section.
133 133  - Implemented the feedback of the professors about the Ontology based on some literature.
134 134  - Adjusted the Introduction.
135 -- Added citations to the pages that needed sourcing (Including research).
136 -- Made some analysis about the data we collected for our results.
137 -- Explored different visuals for displaying the results
137 +- Added citations to the pages that needed sourcing.
138 138  - Proof-read the entire report iteratively as we improved sections repeatedly.
139 139  - Gave some constructive feedback about 90% of the sections on the Xwiki or by group messages.
140 140  - Analysed other group's work report and made minor edits to few sections about aesthetics and structure.
... ... @@ -142,7 +142,4 @@
142 142  - Improved and adapted the general aesthetic of the pages to the export features of XWiki (because export feature changes the nature of the webpages).
143 143  
144 144  == Personal Reflections==
145 -In general I really enjoyed working on this project. I found the lectures to be really interesting. The guest lecturers were really interesting and
146 -The iterative process nature of this class makes it very
147 147  
148 -A significative downside of this project was the lack of motivation of a few team members. It really felt like two groups of people emerged weeks after weekshe fact.that the entire grade is