Changes for page Pierre Bongrand
Last modified by Pierre Bongrand on 2022/04/05 19:37
From version
21.1


edited by Pierre Bongrand
on 2022/03/21 23:19
on 2022/03/21 23:19
Change comment:
There is no comment for this version
To version
19.1


edited by Pierre Bongrand
on 2022/03/21 22:35
on 2022/03/21 22:35
Change comment:
There is no comment for this version
Summary
Details
- Page properties
-
- Content
-
... ... @@ -17,29 +17,16 @@ 17 17 18 18 Finally, I presented this work to the team and we all made choices about: the type of dementia the patient would have, the potential goals and use cases we will focus on, the type of robot to chose. 19 19 20 -Based on my work, we wrote with Sneha and Haoran a first version of: the environment, the stakeholders, the problem scenario, the objectives. We also defined a first use case. 21 - 22 22 ==== Week 2==== 23 -We splitted the team in two subteams. Sneha and I would work on the report while the rest of the group would work on the code. 24 -The point of this was that we could both get an idea on how to code our technical solution and define our problem scenario and personas. 21 +- Personas 25 25 26 -We improved the report by editing the following sections: 27 -- Objectives. We modified our objectives and categorised them in two categories: Increase the life span and Improve quality of life. 28 -- 29 29 30 30 31 - 32 32 ==== Week 3==== 33 - Eventhough we wanted toswitch rolesweek by week so that everyone would be proficient both with the codeand the report we didn't asweaccumulated a bit of work from the previousweek in both subteams. As a result, I worked with Sneha this week on the report and the general goals of the robot.26 +- Use cases 34 34 35 -We mainly worked on the use cases which was a considerable load of work. 36 -As the "technical" subteam gave us some feedback on what was feasible, Sneha and I precised the feasible objectives and came up with 4 different use cases. 37 -We defined these use cases, 38 38 39 39 40 - 41 - 42 - 43 43 ==== Week 4==== 44 44 - Design Patterns 45 45 - Ontology ... ... @@ -59,9 +59,9 @@ 59 59 60 60 61 61 ==== Week 6==== 62 -As many deadlines are approaching at the end of the block and the deliverables for this projects needs to be finished soon, I took a bit of managerial position. 63 63 64 64 51 + 65 65 ==== Week 7==== 66 66 - Ontology 67 67 - Design pattern