Changes for page Pierre Bongrand

Last modified by Pierre Bongrand on 2022/04/05 19:37

From version Icon 21.1 Icon
edited by Pierre Bongrand
on 2022/03/21 23:19
Change comment: There is no comment for this version
To version Icon 17.1 Icon
edited by Pierre Bongrand
on 2022/03/21 22:30
Change comment: There is no comment for this version

Summary

Details

Icon Page properties
Content
... ... @@ -9,37 +9,22 @@
9 9  
10 10  I chose to work on two aspects:
11 11  **Location of PwD:**
12 -I have listed the advantages, disadvantages and specificities of two settings: health care center, and the patient's home.
12 +I have listed the advantages, disadvantages and specificity of two settings: health care center, and the patient's home.
13 13  
14 14  **Interaction Goals:**
15 15  I researched the needs of people with dementia. I identified three types of goals the chosen robot could fulfil: functional, emotional, and safety.
16 16  I listed 5 to 10 potential use cases per goal that I found to be either the most important or very original and not already fulfil.
17 17  
18 -Finally, I presented this work to the team and we all made choices about: the type of dementia the patient would have, the potential goals and use cases we will focus on, the type of robot to chose.
19 -
20 -Based on my work, we wrote with Sneha and Haoran a first version of: the environment, the stakeholders, the problem scenario, the objectives. We also defined a first use case.
21 -
22 22  ==== Week 2====
23 -We splitted the team in two subteams. Sneha and I would work on the report while the rest of the group would work on the code.
24 -The point of this was that we could both get an idea on how to code our technical solution and define our problem scenario and personas.
19 +- Personas
25 25  
26 -We improved the report by editing the following sections:
27 -- Objectives. We modified our objectives and categorised them in two categories: Increase the life span and Improve quality of life.
28 --
29 29  
30 30  
31 -
32 32  ==== Week 3====
33 -Even though we wanted to switch roles week by week so that everyone would be proficient both with the code and the report we didn't as we accumulated a bit of work from the previous week in both subteams. As a result, I worked with Sneha this week on the report and the general goals of the robot.
24 +- Use cases
34 34  
35 -We mainly worked on the use cases which was a considerable load of work.
36 -As the "technical" subteam gave us some feedback on what was feasible, Sneha and I precised the feasible objectives and came up with 4 different use cases.
37 -We defined these use cases,
38 38  
39 39  
40 -
41 -
42 -
43 43  ==== Week 4====
44 44  - Design Patterns
45 45  - Ontology
... ... @@ -59,9 +59,9 @@
59 59  
60 60  
61 61  ==== Week 6====
62 -As many deadlines are approaching at the end of the block and the deliverables for this projects needs to be finished soon, I took a bit of managerial position.
63 63  
64 64  
49 +
65 65  ==== Week 7====
66 66  - Ontology
67 67  - Design pattern