Changes for page Pierre Bongrand

Last modified by Pierre Bongrand on 2022/04/05 19:37

From version Icon 20.1 Icon
edited by Pierre Bongrand
on 2022/03/21 22:42
Change comment: There is no comment for this version
To version Icon 21.1 Icon
edited by Pierre Bongrand
on 2022/03/21 23:19
Change comment: There is no comment for this version

Summary

Details

Icon Page properties
Content
... ... @@ -17,17 +17,29 @@
17 17  
18 18  Finally, I presented this work to the team and we all made choices about: the type of dementia the patient would have, the potential goals and use cases we will focus on, the type of robot to chose.
19 19  
20 +Based on my work, we wrote with Sneha and Haoran a first version of: the environment, the stakeholders, the problem scenario, the objectives. We also defined a first use case.
21 +
20 20  ==== Week 2====
21 -We splitted the tea
22 -- Personas
23 +We splitted the team in two subteams. Sneha and I would work on the report while the rest of the group would work on the code.
24 +The point of this was that we could both get an idea on how to code our technical solution and define our problem scenario and personas.
23 23  
26 +We improved the report by editing the following sections:
27 +- Objectives. We modified our objectives and categorised them in two categories: Increase the life span and Improve quality of life.
28 +-
24 24  
25 25  
31 +
26 26  ==== Week 3====
27 -- Use cases
33 +Even though we wanted to switch roles week by week so that everyone would be proficient both with the code and the report we didn't as we accumulated a bit of work from the previous week in both subteams. As a result, I worked with Sneha this week on the report and the general goals of the robot.
28 28  
35 +We mainly worked on the use cases which was a considerable load of work.
36 +As the "technical" subteam gave us some feedback on what was feasible, Sneha and I precised the feasible objectives and came up with 4 different use cases.
37 +We defined these use cases,
29 29  
30 30  
40 +
41 +
42 +
31 31  ==== Week 4====
32 32  - Design Patterns
33 33  - Ontology
... ... @@ -47,9 +47,9 @@
47 47  
48 48  
49 49  ==== Week 6====
62 +As many deadlines are approaching at the end of the block and the deliverables for this projects needs to be finished soon, I took a bit of managerial position.
50 50  
51 51  
52 -
53 53  ==== Week 7====
54 54  - Ontology
55 55  - Design pattern