Changes for page Rembrandt Oltmans
Last modified by Rembrandt Oltmans on 2022/03/30 12:09
From version
8.1


edited by Rembrandt Oltmans
on 2022/03/30 12:04
on 2022/03/30 12:04
Change comment:
There is no comment for this version
To version
7.1


edited by Rembrandt Oltmans
on 2022/03/30 11:56
on 2022/03/30 11:56
Change comment:
There is no comment for this version
Summary
Details
- Page properties
-
- Content
-
... ... @@ -24,8 +24,8 @@ 24 24 This week I attended the Monday lecture about inclusive design, we also started with planning for the final evaluation and created a planning for how the final few weeks of the course should look for our team to finish everything on time. From this planning I was assigned to write 3 foundation XWiki pages together with Andrei. 25 25 26 26 == Week 7== 27 -During the 7th and almost last week of the project we were busy with planning the evaluation, preparing the robot for the evaluation and the organisation around the evaluation, like getting enough participants. At the start of the week this was still not entirely finished, this caused some time pressure to get everything in order. This however had the advantage of us getting a presentation day the next week on the Tuesday instead of the Monday :) . During the week I, and other team members went to the evaluations of multiple other groups to help them perform their evaluation. This also caused group members from their teams to show up at our evaluation, which helped with getting enough participants. Seeing the other groups their evaluations also helped with getting a idea for our own evaluation. The finishing up of the robot happened on Friday morning, as that was the best time for everyone, which was the same day the final evaluation took place, thus there was some time pressure that day to get it to work. However, in the end the robot was in a working condition, with the help of Ruud, far in time. Which helped with the remainder of the evaluation as the time each person took to take the evaluation was somewhat larger then previously planned. In the end the evaluation went better than expected. 28 28 28 + 29 29 == Week 8== 30 30 31 31